Segari Energy Ventures, Lumut Power Plant

Now in its 24th year of commercial operation, the power plant is still the largest CCGT power plant in Malaysia. The SEV Power Plant continues to generate and supply electricity to TNB, following an award received from the Energy Commission in 2013 for a 10-year extension of the PPA term until June 2027.
Plant Name :Segari Energy Ventures Malaysia,
Lumut Power Plant
Configuration :6 x 141.1(GT)
2 x 221 (ST)
Generating Capacity :1,303 MW
Generating Type :CCGT
COD:1996
Contract Type :Lump Sum
O&M Term :15
X